Howson Homes Ltd builds custom homes, laneway houses, and pre-priced house plans across Ladysmith, Nanaimo, and Vancouver Island. We specialize in fixed-price construction and transparent building processes for homeowners looking to build locally.
top of page
Search

🏗️ Building Permits on Vancouver Island: Ladysmith vs. Duncan vs. Nanaimo — What You Need to Know

  • Writer: Nick Howson
    Nick Howson
  • Oct 20
  • 4 min read

By Howson Homes Ltd — Licensed Residential Builder, Vancouver Island


When you’re ready to build your dream home on Vancouver Island, one of the first and most important steps is obtaining a building permit.


Whether you’re planning to build in Ladysmith, Duncan, or Nanaimo, understanding your local permit process will save you time, money, and frustration. Each municipality follows the same core BC Building Code, but the process, fees, and timelines can vary slightly.

Here’s what you need to know.


📋 Understanding the Building Permit Process


A building permit is the municipality’s way of confirming your home will be built safely and in accordance with the BC Building Code and local zoning bylaws.

Before breaking ground, you’ll need to submit detailed plans, engineering, and site information for review. Once approved, the permit allows construction to begin — and inspectors will check key stages of your build along the way.


🧱 Building Permit Comparison: Ladysmith, Duncan, and Nanaimo


Below is a clear comparison of the main differences in how each municipality handles building permits.

Category

Ladysmith

Duncan

Nanaimo

Application Type

Paper or digital submission via Town Hall

In-person or email submission to Building Department

Fully online ePermit Portal

Typical Review Time

4–6 weeks (longer in peak season)

3–5 weeks (fastest for small projects)

6–8 weeks (higher volume of applications)

Permit Fees

~$10–12 per $1,000 of construction value

~$10 per $1,000

~$11–13 per $1,000 (min. ~$1,000)

Zoning Verification

Required pre-application

Required pre-application

Required; online GIS zoning tool available

Geotechnical Report

Required for slopes, fill, or poor soil

Required for slopes or unstable ground

Required for slopes, proximity to slopes, or waterfront lots

Energy Compliance

BC Energy Step Code report required

Step Code report required

Step Code report required (minimum Step 3 for new homes)

Engineering Drawings

Required for structural and foundation

Required

Required — electronic PDF upload

Septic / Sewer Requirements

On-site septic approval if not on municipal sewer

Same as Ladysmith

Mostly municipal sewer; septic in rural areas

Stormwater Management

Required for most new homes

Required

Required with engineered design on new builds

Licensing Requirement

Licensed Builder or Owner Builder Authorization

Same

Same (strictly verified via BC Housing)

Inspections

Foundation, framing, plumbing, final

Foundation, framing, plumbing, final

More detailed stages: footing, framing, insulation, occupancy

Heritage / Design Zones

Some downtown and waterfront restrictions

Few restrictions

Multiple heritage zones with specific design guidelines

Online Resources

ladysmith.ca → Building & Development

duncan.ca → Building Permits

nanaimo.ca → Building Permits Portal

✅ What They All Have in Common


Even though each municipality runs its own system, the core requirements are the same across Vancouver Island.


1️⃣ Licensed Builder or Owner Builder Authorization

Every home in BC must be built by a Licensed Residential Builder or an Owner Builder authorized through BC Housing. Municipalities verify this before issuing your permit.


2️⃣ BC Energy Step Code Compliance

All three municipalities require homes to meet Step Code standards, which improve energy efficiency. A certified Energy Advisor will model your home and confirm it meets the minimum step level (typically Step 3).


3️⃣ Complete Construction Drawings

You’ll need to submit professional plans:

  • Site plan showing setbacks and grading

  • Floor plans and elevations

  • Foundation and structural engineering drawings

  • Energy compliance documentation

Incomplete or missing details are the most common cause of permit delays.


4️⃣ Site-Specific Reports

If your lot includes fill, slopes, or challenging soil, a Geotechnical Engineer’s report is mandatory. This report ensures your foundation is designed for the site’s conditions and provides stability recommendations.


5️⃣ Stormwater and Drainage Plans

Each town requires a stormwater management plan showing how rainwater will be handled on-site — typically prepared by a civil engineer.


6️⃣ Permit Fees and Timelines

Fees are based on your home’s construction value, and processing times depend on application completeness. Submitting a clean, accurate package can cut review times by several weeks.


⚖️ Key Differences to Keep in Mind


While the steps are similar, there are a few regional differences to note:

  • Nanaimo has the most advanced digital system (ePermits) but also the longest review times due to application volume.

  • Duncan offers a faster review process for smaller builds and is known for straightforward communication with applicants.

  • Ladysmith balances both — moderate review times, options for paper or digital submissions, and more oversight near slopes and waterfront areas.


🧭 The Howson Homes Approach


At Howson Homes Ltd, we handle every step of the building permit process for our clients — from design and engineering coordination to submission and inspection scheduling.

Because we work across Ladysmith, Duncan, and Nanaimo, we know each municipality’s unique expectations, staff, and submission systems. That means fewer revisions, faster approvals, and smoother builds for you.

Our approach is built on clarity, communication, and craftsmanship — ensuring your home is not only beautifully built but efficiently approved.


🏁 Final Thoughts


Building on Vancouver Island doesn’t have to be complicated.Whether you’re planning a custom home, laneway suite, or investment property, understanding your municipality’s building permit process is the key to starting strong.

Each town may have its own procedures, but with an experienced builder on your team, you can avoid costly surprises and keep your project on schedule.


🧰 Ready to Start Building?


If you’re planning a new build in Ladysmith, Duncan, or Nanaimo, we’d love to help make it happen.


📍 Serving mid-Vancouver Island


Let’s make your home-building journey simple, transparent, and stress-free — from permit to possession.




 
 
 

Comments


BC Housing Logo_edited.png
Pacific Home Warranty Logo_edited.png
Screenshot 2025-10-12 at 8.12_edited.jpg
Canadian Home Builders Association Logo_
2 5 10 Year Warranty_edited.jpg

WHAT WE BUILD: 

  • Custom Homes

  • Laneway Homes

  • Spec Homes

  • House Plans

  • Alpine Homes

  • Raw Land Development 

  • Multi Family Development 

  • Home Additions 

  • Major Renovations 

  • Commercial Renovations 

WHERE WE BUILD: 

CONTACT INFORMATION: 

  • Ladysmith 

  • Nanaimo 

  • Duncan

  • Nanoose 

  • Mount Washington Alpine Resort 

  • Gabriola Island 

  • Saltspring Island 

  • Chemanius 

  • Cedar

  • Lantzville 

  • Parksville 

  • Qualicum Beach 

  • Mid Island 

  • Vancouver Island 

Phone: 778-957-0555

Email: Info@howsonhomes.com

Address: 

HOWSON HOMES LTD 

PO Box 2138 Stn Main, 

Ladysmith BC V9G 1B6

HOWSON HOMES LTD

  • Instagram
  • Facebook
  • YouTube
bottom of page